Nepalgunj / Nepalganj
Heat context: Suits: Both hot-dry-season and hot-humid exposure require assessment. Reason: Terai monsoon seasonality; use local humidity, solar gain, occupied-room and task data. No universal city humidity class inferred. Night heat: Comparable occupied-room hot-night series not verified. Nepalgunj Heat Action Plan (opens in a new tab) ↗ · NRCS/municipal anticipatory action in Nepalgunj (opens in a new tab) ↗
Official heat plans: Official guidance or data Published 2023 HAP; implementation described in Movement account. Nepalgunj Heat Action Plan (opens in a new tab) ↗ · NRCS/municipal anticipatory action in Nepalgunj (opens in a new tab) ↗
Legal basis: National reference: country.legal_basis Local adoption and budget: Signed current municipal decision, applicable by-laws and appropriation require confirmation.
Agencies responsible: Documented actor ids: Proposed counterparts: - Municipal executive, LDMC and LEOC
- District administration/DDMC and health office
- Ward committees, schools and local health facilities
- Water and NEA service operators
- Worker/community/disability/women representatives and employers
Caveat: Proposed counterparts are functional roles, not confirmed participation or delegated heat authority.
Warnings: National reference: country.warnings Local trigger: Current authorised city-specific action/finance trigger not verified. Non smartphone route: Plans/partner accounts describe channels; actual last-mile receipt requires verification.
Rules for heat at work: Reference: country.occupational_heat_rules Local enforcement and paid rest: Not verified
Cooling and buildings: Reference: country.cooling_building_policy Current local thermal code: Not verified Design caution: Shade/solar-gain reduction, ventilation, efficient active cooling and outage fallback would ideally suit actual humidity, air quality, tenure and structural/fire conditions.
Money for protection: Costs: Currency: NPR Verification: Not verified Note: No comparable installed/operating package costs verified. a blank is not zero; programme budgets are not household unit prices. Reference: country.finance_mechanisms Local heat budget and release: Not verified
A place to start (proposed): Pair municipal plan with actual cooling/water uptime, worker access, night recovery and recurrent budgets.
Known, inferred, uncertain: Known: Published 2023 HAP; implementation described in Movement account. Inferred: Pair municipal plan with actual cooling/water uptime, worker access, night recovery and recurrent budgets. Uncertain: Actual local service reach, exposure reduction, sustained financing and independent health/income benefit.
Province: Lumbini
Boundary: Municipality, Banke district and Khajura station are different units.
Selection basis: Official guidance or data Documented Terai heat-concern case, supported by city planning/implementation or official station observations. Not a verified national top-eight rank. Nepalgunj Heat Action Plan (opens in a new tab) ↗ · NRCS/municipal anticipatory action in Nepalgunj (opens in a new tab) ↗
Tradeoffs to check:
- Electricity bills, peak demand, outages and refrigerant lifecycle
- Water availability/quality, shade maintenance and flood resilience
- Gendered unpaid care and volunteer labour; disability/language/tenure access
- Rent increases, displacement and green gentrification
- Worker pay, permission to rest and safe transport to refuges
Dhangadhi
Heat context: Suits: Both hot-dry-season and hot-humid exposure require assessment. Reason: Terai monsoon seasonality; use local humidity, solar gain, occupied-room and task data. No universal city humidity class inferred. Night heat: Dhangadhi HAP describes monsoon night recovery constraints. Dhangadhi Heat Action Plan (opens in a new tab) ↗ · Dhangadhi plan release and community research account (opens in a new tab) ↗
Official heat plans: Official guidance or data Published 2025 HAP with proposed Heat Index triggers; epidemiological validation not established. Dhangadhi Heat Action Plan (opens in a new tab) ↗ · Dhangadhi plan release and community research account (opens in a new tab) ↗
Legal basis: National reference: country.legal_basis Local adoption and budget: Signed current municipal decision, applicable by-laws and appropriation require confirmation.
Agencies responsible: Documented actor ids: Proposed counterparts: - Municipal executive, LDMC and LEOC
- District administration/DDMC and health office
- Ward committees, schools and local health facilities
- Water and NEA service operators
- Worker/community/disability/women representatives and employers
Caveat: Proposed counterparts are functional roles, not confirmed participation or delegated heat authority.
Warnings: National reference: country.warnings Local trigger: HAP proposal based on ERA5 Heat Index; do not substitute air temperature or treat as health-validated. Non smartphone route: Plans/partner accounts describe channels; actual last-mile receipt requires verification.
Rules for heat at work: Reference: country.occupational_heat_rules Local enforcement and paid rest: Not verified
Cooling and buildings: Reference: country.cooling_building_policy Current local thermal code: Not verified Design caution: Shade/solar-gain reduction, ventilation, efficient active cooling and outage fallback would ideally suit actual humidity, air quality, tenure and structural/fire conditions.
Money for protection: Costs: Currency: NPR Verification: Not verified Note: No comparable installed/operating package costs verified. a blank is not zero; programme budgets are not household unit prices. Reference: country.finance_mechanisms Local heat budget and release: Not verified
A place to start (proposed): Test warning receipt and ability to act, with women, informal workers, schools and night-time exposure.
Known, inferred, uncertain: Known: Published 2025 HAP with proposed Heat Index triggers; epidemiological validation not established. Inferred: Test warning receipt and ability to act, with women, informal workers, schools and night-time exposure. Uncertain: Actual local service reach, exposure reduction, sustained financing and independent health/income benefit.
Province: Sudurpashchim
Boundary: Sub-metropolitan boundary, Kailali district and ERA5 gridcell exposure are not interchangeable.
Selection basis: Official guidance or data Documented Terai heat-concern case, supported by city planning/implementation or official station observations. Not a verified national top-eight rank. Dhangadhi Heat Action Plan (opens in a new tab) ↗ · Dhangadhi plan release and community research account (opens in a new tab) ↗
Tradeoffs to check:
- Electricity bills, peak demand, outages and refrigerant lifecycle
- Water availability/quality, shade maintenance and flood resilience
- Gendered unpaid care and volunteer labour; disability/language/tenure access
- Rent increases, displacement and green gentrification
- Worker pay, permission to rest and safe transport to refuges
Siddharthanagar / Bhairahawa
Heat context: Suits: Both hot-dry-season and hot-humid exposure require assessment. Reason: Terai monsoon seasonality; use local humidity, solar gain, occupied-room and task data. No universal city humidity class inferred. Night heat: Comparable occupied-room hot-night series not verified. NRCS Leading Change Through Heat Action leaflet (opens in a new tab) ↗ · IHRR heat anticipatory-action institutionalisation study (opens in a new tab) ↗ · DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Official heat plans: Reported, not evaluated NRCS reports planning/validation; final municipal text and appropriation not retrieved. NRCS Leading Change Through Heat Action leaflet (opens in a new tab) ↗ · IHRR heat anticipatory-action institutionalisation study (opens in a new tab) ↗ · DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Legal basis: National reference: country.legal_basis Local adoption and budget: Signed current municipal decision, applicable by-laws and appropriation require confirmation.
Agencies responsible: Documented actor ids: Proposed counterparts: - Municipal executive, LDMC and LEOC
- District administration/DDMC and health office
- Ward committees, schools and local health facilities
- Water and NEA service operators
- Worker/community/disability/women representatives and employers
Caveat: Proposed counterparts are functional roles, not confirmed participation or delegated heat authority.
Warnings: National reference: country.warnings Local trigger: Current authorised city-specific action/finance trigger not verified. Non smartphone route: Plans/partner accounts describe channels; actual last-mile receipt requires verification.
Rules for heat at work: Reference: country.occupational_heat_rules Local enforcement and paid rest: Not verified
Cooling and buildings: Reference: country.cooling_building_policy Current local thermal code: Not verified Design caution: Shade/solar-gain reduction, ventilation, efficient active cooling and outage fallback would ideally suit actual humidity, air quality, tenure and structural/fire conditions.
Money for protection: Costs: Currency: NPR Verification: Not verified Note: No comparable installed/operating package costs verified. a blank is not zero; programme budgets are not household unit prices. Reference: country.finance_mechanisms Local heat budget and release: Not verified
A place to start (proposed): Verify plan ownership; cost market/worker protection and public-building cooling with upkeep.
Known, inferred, uncertain: Known: NRCS reports planning/validation; final municipal text and appropriation not retrieved. Inferred: Verify plan ownership; cost market/worker protection and public-building cooling with upkeep. Uncertain: Actual local service reach, exposure reduction, sustained financing and independent health/income benefit.
Province: Lumbini
Boundary: Municipality, airport station and Rupandehi district are best kept distinct.
Selection basis: Reported, not evaluated Documented Terai heat-concern case, supported by city planning/implementation or official station observations. Not a verified national top-eight rank. NRCS Leading Change Through Heat Action leaflet (opens in a new tab) ↗ · IHRR heat anticipatory-action institutionalisation study (opens in a new tab) ↗ · DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Tradeoffs to check:
- Electricity bills, peak demand, outages and refrigerant lifecycle
- Water availability/quality, shade maintenance and flood resilience
- Gendered unpaid care and volunteer labour; disability/language/tenure access
- Rent increases, displacement and green gentrification
- Worker pay, permission to rest and safe transport to refuges
Biratnagar
Heat context: Suits: Both hot-dry-season and hot-humid exposure require assessment. Reason: Terai monsoon seasonality; use local humidity, solar gain, occupied-room and task data. No universal city humidity class inferred. Night heat: Comparable occupied-room hot-night series not verified. NRCS Leading Change Through Heat Action leaflet (opens in a new tab) ↗ · IHRR heat anticipatory-action institutionalisation study (opens in a new tab) ↗ · DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Official heat plans: Reported, not evaluated NRCS reports heat planning; final municipal text, adopted trigger and budget not retrieved. NRCS Leading Change Through Heat Action leaflet (opens in a new tab) ↗ · IHRR heat anticipatory-action institutionalisation study (opens in a new tab) ↗ · DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Legal basis: National reference: country.legal_basis Local adoption and budget: Signed current municipal decision, applicable by-laws and appropriation require confirmation.
Agencies responsible: Documented actor ids: Proposed counterparts: - Municipal executive, LDMC and LEOC
- District administration/DDMC and health office
- Ward committees, schools and local health facilities
- Water and NEA service operators
- Worker/community/disability/women representatives and employers
Caveat: Proposed counterparts are functional roles, not confirmed participation or delegated heat authority.
Warnings: National reference: country.warnings Local trigger: Current authorised city-specific action/finance trigger not verified. Non smartphone route: Plans/partner accounts describe channels; actual last-mile receipt requires verification.
Rules for heat at work: Reference: country.occupational_heat_rules Local enforcement and paid rest: Not verified
Cooling and buildings: Reference: country.cooling_building_policy Current local thermal code: Not verified Design caution: Shade/solar-gain reduction, ventilation, efficient active cooling and outage fallback would ideally suit actual humidity, air quality, tenure and structural/fire conditions.
Money for protection: Costs: Currency: NPR Verification: Not verified Note: No comparable installed/operating package costs verified. a blank is not zero; programme budgets are not household unit prices. Reference: country.finance_mechanisms Local heat budget and release: Not verified
A place to start (proposed): Link warnings, industrial/outdoor work, clinics and income protection with actual task exposure.
Known, inferred, uncertain: Known: NRCS reports heat planning; final municipal text, adopted trigger and budget not retrieved. Inferred: Link warnings, industrial/outdoor work, clinics and income protection with actual task exposure. Uncertain: Actual local service reach, exposure reduction, sustained financing and independent health/income benefit.
Province: Koshi
Boundary: Metropolitan area, airport station and Morang district differ.
Selection basis: Reported, not evaluated Documented Terai heat-concern case, supported by city planning/implementation or official station observations. Not a verified national top-eight rank. NRCS Leading Change Through Heat Action leaflet (opens in a new tab) ↗ · IHRR heat anticipatory-action institutionalisation study (opens in a new tab) ↗ · DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Tradeoffs to check:
- Electricity bills, peak demand, outages and refrigerant lifecycle
- Water availability/quality, shade maintenance and flood resilience
- Gendered unpaid care and volunteer labour; disability/language/tenure access
- Rent increases, displacement and green gentrification
- Worker pay, permission to rest and safe transport to refuges
Birgunj / Birganj
Heat context: Suits: Both hot-dry-season and hot-humid exposure require assessment. Reason: Terai monsoon seasonality; use local humidity, solar gain, occupied-room and task data. No universal city humidity class inferred. Night heat: Comparable occupied-room hot-night series not verified. DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Official heat plans: Official guidance or data DHM station evidence; adopted city-specific HAP and heat budget not retrieved. DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Legal basis: National reference: country.legal_basis Local adoption and budget: Signed current municipal decision, applicable by-laws and appropriation require confirmation.
Agencies responsible: Documented actor ids: Proposed counterparts: - Municipal executive, LDMC and LEOC
- District administration/DDMC and health office
- Ward committees, schools and local health facilities
- Water and NEA service operators
- Worker/community/disability/women representatives and employers
Caveat: Proposed counterparts are functional roles, not confirmed participation or delegated heat authority.
Warnings: National reference: country.warnings Local trigger: Current authorised city-specific action/finance trigger not verified. Non smartphone route: Plans/partner accounts describe channels; actual last-mile receipt requires verification.
Rules for heat at work: Reference: country.occupational_heat_rules Local enforcement and paid rest: Not verified
Cooling and buildings: Reference: country.cooling_building_policy Current local thermal code: Not verified Design caution: Shade/solar-gain reduction, ventilation, efficient active cooling and outage fallback would ideally suit actual humidity, air quality, tenure and structural/fire conditions.
Money for protection: Costs: Currency: NPR Verification: Not verified Note: No comparable installed/operating package costs verified. a blank is not zero; programme budgets are not household unit prices. Reference: country.finance_mechanisms Local heat budget and release: Not verified
A place to start (proposed): Explore market/transport and workplace protection with locally identified worker and municipal counterparts.
Known, inferred, uncertain: Known: DHM station evidence; adopted city-specific HAP and heat budget not retrieved. Inferred: Explore market/transport and workplace protection with locally identified worker and municipal counterparts. Uncertain: Actual local service reach, exposure reduction, sustained financing and independent health/income benefit.
Province: Madhesh
Boundary: DHM station and metropolitan exposure not identical; Parsa district includes other places.
Selection basis: Official guidance or data Documented Terai heat-concern case, supported by city planning/implementation or official station observations. Not a verified national top-eight rank. DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Tradeoffs to check:
- Electricity bills, peak demand, outages and refrigerant lifecycle
- Water availability/quality, shade maintenance and flood resilience
- Gendered unpaid care and volunteer labour; disability/language/tenure access
- Rent increases, displacement and green gentrification
- Worker pay, permission to rest and safe transport to refuges
Janakpurdham / Janakpur
Heat context: Suits: Both hot-dry-season and hot-humid exposure require assessment. Reason: Terai monsoon seasonality; use local humidity, solar gain, occupied-room and task data. No universal city humidity class inferred. Night heat: Comparable occupied-room hot-night series not verified. DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Official heat plans: Official guidance or data DHM station evidence; adopted city-specific HAP and operating arrangements not retrieved. DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Legal basis: National reference: country.legal_basis Local adoption and budget: Signed current municipal decision, applicable by-laws and appropriation require confirmation.
Agencies responsible: Documented actor ids: Proposed counterparts: - Municipal executive, LDMC and LEOC
- District administration/DDMC and health office
- Ward committees, schools and local health facilities
- Water and NEA service operators
- Worker/community/disability/women representatives and employers
Caveat: Proposed counterparts are functional roles, not confirmed participation or delegated heat authority.
Warnings: National reference: country.warnings Local trigger: Current authorised city-specific action/finance trigger not verified. Non smartphone route: Plans/partner accounts describe channels; actual last-mile receipt requires verification.
Rules for heat at work: Reference: country.occupational_heat_rules Local enforcement and paid rest: Not verified
Cooling and buildings: Reference: country.cooling_building_policy Current local thermal code: Not verified Design caution: Shade/solar-gain reduction, ventilation, efficient active cooling and outage fallback would ideally suit actual humidity, air quality, tenure and structural/fire conditions.
Money for protection: Costs: Currency: NPR Verification: Not verified Note: No comparable installed/operating package costs verified. a blank is not zero; programme budgets are not household unit prices. Reference: country.finance_mechanisms Local heat budget and release: Not verified
A place to start (proposed): Explore shaded public routes/queues and school/clinic cooling, with water and operating-budget checks.
Known, inferred, uncertain: Known: DHM station evidence; adopted city-specific HAP and operating arrangements not retrieved. Inferred: Explore shaded public routes/queues and school/clinic cooling, with water and operating-budget checks. Uncertain: Actual local service reach, exposure reduction, sustained financing and independent health/income benefit.
Province: Madhesh
Boundary: Airport station, sub-metropolitan boundary and Dhanusha district differ.
Selection basis: Official guidance or data Documented Terai heat-concern case, supported by city planning/implementation or official station observations. Not a verified national top-eight rank. DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Tradeoffs to check:
- Electricity bills, peak demand, outages and refrigerant lifecycle
- Water availability/quality, shade maintenance and flood resilience
- Gendered unpaid care and volunteer labour; disability/language/tenure access
- Rent increases, displacement and green gentrification
- Worker pay, permission to rest and safe transport to refuges
Gaur
Heat context: Suits: Both hot-dry-season and hot-humid exposure require assessment. Reason: Terai monsoon seasonality; use local humidity, solar gain, occupied-room and task data. No universal city humidity class inferred. Night heat: Comparable occupied-room hot-night series not verified. RAIN heat early-action implementation account (opens in a new tab) ↗
Official heat plans: Reported, not evaluated RAIN reportsJune 2025 early action and LDMC coordination; signed municipal HAP not retrieved. RAIN heat early-action implementation account (opens in a new tab) ↗
Legal basis: National reference: country.legal_basis Local adoption and budget: Signed current municipal decision, applicable by-laws and appropriation require confirmation.
Agencies responsible: Documented actor ids: Proposed counterparts: - Municipal executive, LDMC and LEOC
- District administration/DDMC and health office
- Ward committees, schools and local health facilities
- Water and NEA service operators
- Worker/community/disability/women representatives and employers
Caveat: Proposed counterparts are functional roles, not confirmed participation or delegated heat authority.
Warnings: National reference: country.warnings Local trigger: Current authorised city-specific action/finance trigger not verified. Non smartphone route: RAIN reports FCHV, local radio and public announcements.
Rules for heat at work: Reference: country.occupational_heat_rules Local enforcement and paid rest: Not verified
Cooling and buildings: Reference: country.cooling_building_policy Current local thermal code: Not verified Design caution: Shade/solar-gain reduction, ventilation, efficient active cooling and outage fallback would ideally suit actual humidity, air quality, tenure and structural/fire conditions.
Money for protection: Costs: Currency: NPR Verification: Not verified Note: No comparable installed/operating package costs verified. a blank is not zero; programme budgets are not household unit prices. Reference: country.finance_mechanisms Local heat budget and release: Not verified
A place to start (proposed): Build on reported FCHV/radio/water action; add verified authorisation, worker agency and operating finance.
Known, inferred, uncertain: Known: RAIN reportsJune 2025 early action and LDMC coordination; signed municipal HAP not retrieved. Inferred: Build on reported FCHV/radio/water action; add verified authorisation, worker agency and operating finance. Uncertain: Actual local service reach, exposure reduction, sustained financing and independent health/income benefit.
Province: Madhesh
Boundary: Municipality, local observation and Rautahat district are best distinguished.
Selection basis: Reported, not evaluated Documented Terai heat-concern case, supported by city planning/implementation or official station observations. Not a verified national top-eight rank. RAIN heat early-action implementation account (opens in a new tab) ↗
Tradeoffs to check:
- Electricity bills, peak demand, outages and refrigerant lifecycle
- Water availability/quality, shade maintenance and flood resilience
- Gendered unpaid care and volunteer labour; disability/language/tenure access
- Rent increases, displacement and green gentrification
- Worker pay, permission to rest and safe transport to refuges
Jaleshwar / Jaleshwor / Jaleshowr
Heat context: Suits: Both hot-dry-season and hot-humid exposure require assessment. Reason: Terai monsoon seasonality; use local humidity, solar gain, occupied-room and task data. No universal city humidity class inferred. Night heat: DHM Jaleshwor station has elevated seasonal minimum temperature in 2024 report. RAIN heat early-action implementation account (opens in a new tab) ↗ · DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Official heat plans: Reported, not evaluated RAIN reportsJune 2025 water/outreach; DHM documents local station night-temperature concern; signed HAP not retrieved. RAIN heat early-action implementation account (opens in a new tab) ↗ · DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Legal basis: National reference: country.legal_basis Local adoption and budget: Signed current municipal decision, applicable by-laws and appropriation require confirmation.
Agencies responsible: Documented actor ids: Proposed counterparts: - Municipal executive, LDMC and LEOC
- District administration/DDMC and health office
- Ward committees, schools and local health facilities
- Water and NEA service operators
- Worker/community/disability/women representatives and employers
Caveat: Proposed counterparts are functional roles, not confirmed participation or delegated heat authority.
Warnings: National reference: country.warnings Local trigger: Current authorised city-specific action/finance trigger not verified. Non smartphone route: RAIN reports FCHV, local radio and public announcements.
Rules for heat at work: Reference: country.occupational_heat_rules Local enforcement and paid rest: Not verified
Cooling and buildings: Reference: country.cooling_building_policy Current local thermal code: Not verified Design caution: Shade/solar-gain reduction, ventilation, efficient active cooling and outage fallback would ideally suit actual humidity, air quality, tenure and structural/fire conditions.
Money for protection: Costs: Currency: NPR Verification: Not verified Note: No comparable installed/operating package costs verified. a blank is not zero; programme budgets are not household unit prices. Reference: country.finance_mechanisms Local heat budget and release: Not verified
A place to start (proposed): Connect night recovery, water access, school continuity and care-work protection with local services.
Known, inferred, uncertain: Known: RAIN reportsJune 2025 water/outreach; DHM documents local station night-temperature concern; signed HAP not retrieved. Inferred: Connect night recovery, water access, school continuity and care-work protection with local services. Uncertain: Actual local service reach, exposure reduction, sustained financing and independent health/income benefit.
Province: Madhesh
Boundary: Municipality and Mahottari district differ; retain alternate spellings for source matching.
Selection basis: Reported, not evaluated Documented Terai heat-concern case, supported by city planning/implementation or official station observations. Not a verified national top-eight rank. RAIN heat early-action implementation account (opens in a new tab) ↗ · DHM post-monsoon precipitation and temperature summary, 2024 (opens in a new tab) ↗
Tradeoffs to check:
- Electricity bills, peak demand, outages and refrigerant lifecycle
- Water availability/quality, shade maintenance and flood resilience
- Gendered unpaid care and volunteer labour; disability/language/tenure access
- Rent increases, displacement and green gentrification
- Worker pay, permission to rest and safe transport to refuges